UX Designer
Solo project with mentor feedback
1 months
2-week sprint cycle (16 days)
2-week sprint cycle
A project from my OpenClassrooms UX design course, working on the real non-profit Kopernik's website landing page in a 2-week sprint cycle. I organized the roadmap and tasks, investigated mental models and usability issues through card sorting and usability testing, and proposed multiple design alternatives.
Kopernik's website had usability problems including unclear information architecture, duplicate content, and confusing navigation. Users were not happy with the site despite being able to complete tasks. The landing page did not easily convey the organization's track record, and users needed to explore different pages in depth.
I conducted Hybrid Card Sorting and Usability Testing to identify user mental models and usability issues. Based on the findings, I proposed two design alternatives that addressed the identified problems, including decluttering the landing page, adding donation CTAs, displaying organization performance metrics, and reorganizing content according to mental models.
Kopernik's website had usability problems including unclear information architecture, duplicate content, and confusing navigation. Users were not happy with the site despite being able to complete tasks. The landing page did not easily convey the organization's track record, and users needed to explore different pages in depth.
I conducted Hybrid Card Sorting and Usability Testing to identify user mental models and usability issues. Based on the findings, I proposed two design alternatives that addressed the identified problems, including decluttering the landing page, adding donation CTAs, displaying organization performance metrics, and reorganizing content according to mental models.


BEFORE: BEFORE: The original landing page had usability issues: unclear information architecture with duplicate navigation elements, confusing footer structure, and lack of donation CTAs. Users struggled to find project information and donation options.
AFTER: AFTER: The redesigned landing page addresses usability issues: decluttered navigation with consolidated menu items, clear donation CTAs prominently displayed, content reorganized according to user mental models from card sorting, and improved information hierarchy.


BEFORE: BEFORE: The original donation content page had unclear layout and lacked prominent call-to-action buttons. Users had difficulty understanding how to donate and what their donation would support.
AFTER: AFTER: The redesigned donation content page features clear layout with prominent donation CTAs, improved visual hierarchy, and better explanation of how donations support projects. It's designed to improve user engagement and conversion rates.
Hybrid Card Sorting (Optimal Workshop) and Usability Testing with 3 participants who have donated or would like to donate to the organization.
All test users were able to complete tasks, but the website had usability problems. Key findings included: users not knowing the difference from other NPOs, users not believing projects are really taking place, confusing navigation names in Japanese version, and unclear content intent.
The card sorting results showed that the original placement is relatively acceptable, but content needs to be reorganized according to mental models. Users need easily visible content such as history, number of projects, number of partners, and amount of donations to understand the organization's track record.

Project roadmap outlining the 2-week sprint cycle, key tasks, and milestones for the Kopernik website redesign project.

Current sitemap analysis revealed duplicate navigation elements and confusing footer structure. Navigation items are shown in blue, filters in orange, content in white, and footer in green.
Open card sorting with 5 participants and 30 cards
| Cluster | Similarity | Frequency |
|---|---|---|
| Product Info | 89% | 95% |
| Customer Support | 82% | 80% |
| Corporate Info | 95% | 100% |
| Results/Case Studies | 65% | 70% |
Open Card Sorting with 5 participants (User A, B, C, D, E) using 30 cards. Results showed that the original placement is relatively acceptable, but content needs to be reorganized according to mental models. Key clusters: 'SIGN IN' Navigation menu → Footer (66%), 'INSIGHTS & REPORTS' Navigation menu → Contents (66%). Main clusters identified: Product Info (89% similarity, 95% frequency), Customer Support (82% similarity, 80% frequency), Corporate Info (95% similarity, 100% frequency), Results/Case Studies (65% similarity, 70% frequency).
Open card sorting with 5 participants and 30 cards
Traditional 3-part structure (Products, Support, About Us)
Business-oriented 'Solutions' approach
Japanese-friendly labels
Detailed category names
Abstract 'experience-type' labeling
Visualization of how 5 participants organized content during card sorting, revealing diverse mental models. Participant patterns: Participant-1 used traditional 3-part structure (Products, Support, About Us), Participant-2 focused on business-oriented 'Solutions' approach, Participant-3 preferred Japanese-friendly labels, Participant-4 used detailed category names, Participant-5 adopted abstract 'experience-type' labeling. The three groups bordering the red line represent the original header & navigation, content, and footer respectively.

Optimal Workshop was used to conduct Hybrid Card Sorting, helping identify user mental models and information architecture preferences.
Results from usability testing with 3 users and user interviews
| Task | Completed |
|---|---|
| Visit the site for the first time and learn about the organization | ✓ |
| Learn about the organization's activities | ✓ |
| Donate or sign up for the newsletter | ✓ |
| Question | Result |
|---|---|
| Perceived Ease of Use | Neutral |
All test users were able to complete tasks
Users not knowing the difference from other NPOs
Users not believing projects are really taking place
Confusing navigation names in Japanese version
Unclear content intent
Usability testing was conducted with 3 participants who have donated or would like to donate to the organization. All test users were able to complete tasks, but the website had usability problems. Key improvements after the redesign: onboarding bottlenecks resolved, and fewer steps to reach target content. Example: order time reduced from 5 minutes to 2 minutes after redesign.
I created two design propositions based on card sorting and usability testing findings. After receiving feedback from the client (mentor), I went through a last iteration that addressed specific revision requests, including matching content grid, changing donation status bar to grayscale, and integrating self-introduction and work descriptions.

First proposed IA update reflecting only what we learned from card sorting. This is a modest proposal that maintains the original structure while addressing key findings.

Second proposed IA update reflecting card sorting results and interview findings. Includes renaming 'INSIGHTS & REPORTS' to 'Past Projects' and 'Ideas', creating 'Upcoming Projects' section, and moving 'DIGITAL INITIATIVE' alongside other work.
The final design iteration addressed client feedback including: matching content grid for self-introduction, changing red donation status bar to grayscale, and integrating standalone content into OUR WORK section.
The new design met the nonprofit's main goals and improved the user experience by combining content soliciting donations from users with its CTA, revising information architecture for clearer layout, and addressing usability issues identified in research.
Design-time target (estimate). Actual conversion rate was not measured.
Design-time target from the new copy (estimate). Not an actual measurement.
Design-time target from integrating the organization's performance into the landing page (estimate). Not an actual measurement.
All test users were able to complete tasks successfully. Users had good reactions to the UI and navigation menu. However, users expressed concerns about newsletter sign-up pop-ups, confusing navigation names in Japanese version, and lack of clarity about project activities.
Client (mentor) provided specific revision requests including matching content grid, changing donation status bar to grayscale, and integrating self-introduction and work descriptions. The final design was approved after addressing these requests.
After evaluating and digging into the website's information architecture, we discovered issues such as users not knowing why content was here and some duplication. Copy and design, including visualization of information and benefits of action, are important not only for CTA buttons but also for getting users to take action.
This new design does not completely solve the problems identified in the research. It is important to turn the iterative approach around quickly. Next steps include measuring the effectiveness of redesign, conducting usability testing, content audit, and card sorting to overhaul contents of each page.